ESTIMATING & BOQ SERVICES

Accurate Takeoffs and Competitive Bids — Delivered Faster Than Your Competition

Trade-ready quantity takeoffs, detailed Bills of Quantities, and complete bid packages — delivered in 48 to 72 hours so you can bid more projects without adding estimating headcount.

THE PROBLEM

Estimating Bottlenecks Cost You Bids — And Margin

Estimating is time-consuming and detail-intensive, and it can make or break project profitability. When estimating bottlenecks your bidding capacity, you miss opportunities. When estimates are rushed, you lose margin.

Most contractors face a predictable set of challenges that limit their ability to grow — and a small in-house team simply can’t absorb every RFP that comes in at once.

❌  3–5 days per bid, creating bottlenecks on multiple RFPs
❌  Manual PDF takeoffs are error-prone — missed items erode margin
❌  Inconsistent formats make it hard to compare bids
❌  Small teams can’t scale bidding volume without costly new hires
❌  Rushed bids risk under-pricing and scope gaps

WHAT WE DELIVER

Every Engagement Includes a Complete, Bid-Ready Package

Quantity Takeoffs

Measured from architectural and structural drawings (PDF, CAD, Bluebeam).

Material Cost Estimates

Built with current supplier pricing data for accurate, competitive numbers.

Labor Hour Breakdowns

Calculated by trade and project phase using regional productivity rates.

Bill of Quantities (BOQ)

Formatted for client or owner submission, organised by CSI division or trade.

Bid Package Preparation

Proposal formatting support to get your submission polished and on time.

Value Engineering Options

Alternatives that improve competitiveness without cutting scope.

HOW IT WORKS

Our Estimating Process

1. Scope Review

We review the full drawing set, identify trade scopes, and flag RFI items before takeoff begins.

2. Digital Takeoff

A page-by-page digital takeoff measuring areas, linear footage, counts, and volumes.

3. Quantity Verification

Quantities are cross-checked against plan notes, specs, and typical waste factors.

4. Cost Application

Current material pricing and regional labour productivity rates are applied to each line item.

5. BOQ Assembly

Quantities and costs are assembled into a formatted BOQ with a grand-total summary sheet.

6. Review & Delivery

A senior estimator reviews the estimate before delivery in Excel, PDF, or Procore.

TOOLS WE USE

We Work Inside the Platforms Your Team Already Uses

PlanSwift

Digital plan takeoff

Bluebeam Revu

PDF markup & takeoff

Microsoft Excel

BOQ formatting & costing

Procore

Bid package management

Autodesk Construction Cloud

Plan management & RFIs

RS Means / Local Pricing

Current material & labour cost data

KEY OUTCOMES

Performance Benchmarks Across Every Engagement

Aggregate results from commercial, industrial, and specialty trade projects.

48–72 HRS

Standard estimate turnaround

±2–3%

Estimate accuracy vs. final project cost

18–25%

Bid win rate improvement reported by clients

Up to 30

Procore bid packages issued per project

15–120

Drawing sheets processed per engagement

1–12+

CSI divisions covered in a single engagement

3–12

Scope gaps identified before submission

CLIENT RESULTS

Real Outcomes From Contractor Ally Clients

“This was the most detailed estimate we had submitted in five years of bidding. The clearly itemised BOQ gave the owner real confidence in our scope understanding.”

Project Ownership

Commercial General Contractor, Denver, CO

58 hrs delivery  |  ±2.1% accuracy  |  Won — $4.38M

“The flexibility of three alternate concrete mix designs was a deciding factor in being awarded this subcontract.”

Project Leadership

Specialty Concrete Subcontractor, Houston, TX

44 hrs delivery  |  3,820 CY calculated  |  Won — $1.92M

More Documented Outcomes

Awarded — $2.74M

Public school renovation, Austin, TX — 6 scope gaps caught before submission, preventing a post-award dispute.

Awarded — $3.15M

Mixed-use MEP project, Nashville, TN — 23 scope changes caught across 3 addenda, avoiding a $180K under-pricing error.

Ready to Bid More Projects Without Adding Headcount?

Share your next set of plans and your bid deadline — our estimator confirms scope within 4 business hours and delivers your BOQ within 48 to 72 hours.